Back to work in the park


After a short break caused by the snow and the Easter holiday, work has resumed in the park. The slabs are being put back on east side of the Lily Pond, and work has started on the south side. On effect of work on the south side is that at present it isn't possible to get into the area enclosed by the wall around the Lily Pond.


The central path in the Rose Garden has now had the remaining slabs laid, though it is still closed as there is some more work to be done on the low walls.

Meanwhile the distribution cabinet is now in place ready for later installation of lighting around the priory ruins.